Flow Rate Override for Part G Compliance
D
Dean Loizou
Hi Team,
Is it possible to manually cap fixture flow rates in H2X in line with Approved Document Part G (Table 2.2) (e.g. shower 8 L/min, basin 5 L/min, etc.)?
I’d like to apply these limits to assess the impact on peak demand and BS EN 806 pipe sizing.
Log In