MIS-3000D requires the installer to include "The specification of any new domestic hot water cylinder and its recovery rate." Adding the recovery rate field to the DHW Annual Demand section of the Heat Load Report export is an additional step that could be avoided. Please consider adding in the field to the DHW cylinder.